fix for #90 #1

Open
krombel wants to merge 7 commits from esm-asar-entrypoints into main
Owner
should fix https://github.com/electron/universal/issues/90 based on https://github.com/electron/universal/pull/101
krombel added 7 commits 2025-12-12 14:57:00 +01:00
Co-authored-by: Erik Moura <erikian@erikian.dev>
fix build
Some checks failed
Check Semantic Commit / Validate PR Title (pull_request) Failing after 13s
Add to Ecosystem WG Project / add-to-project (pull_request_target) Failing after 16s
Publish documentation / docs (push) Failing after 7s
Test / Test (22.12.x) (pull_request) Has been cancelled
60b8772212
krombel added 2 commits 2025-12-12 17:12:03 +01:00
fix build
Some checks failed
Check Semantic Commit / Validate PR Title (pull_request) Failing after 13s
Add to Ecosystem WG Project / add-to-project (pull_request_target) Failing after 16s
Publish documentation / docs (push) Failing after 7s
Test / Test (22.12.x) (pull_request) Has been cancelled
60b8772212
fix build
Some checks failed
Publish documentation / docs (push) Failing after 2s
Check Semantic Commit / Validate PR Title (pull_request) Failing after 2s
Test / Test (22.12.x) (pull_request) Has been cancelled
75309d0945
Some checks failed
Publish documentation / docs (push) Failing after 2s
Check Semantic Commit / Validate PR Title (pull_request) Failing after 2s
Test / Test (22.12.x) (pull_request) Has been cancelled
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin esm-asar-entrypoints:esm-asar-entrypoints
git checkout esm-asar-entrypoints
Sign in to join this conversation.
No Reviewers
No Label
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: krombel/electron-universal#1
No description provided.